Operated Plant - Local

Mouse over on the power plant to view more details.
Tanjung Bin Energy, Malaysia
Configuration: 1 x 1000 (ST)
Generating Capacity: 1,000 MW
Generation Type: Coal Fired
COD: 2015
Contract Type: Lump Sum
O&M Term: 25
Status: On Going
Tanjung Bin Power Plant, Malaysia
Configuration: 3 x 700 (ST)
Generating Capacity: 2,100 MW
Generation Type: Coal Fired
COD: 2006
Contract Type: Lump Sum
O&M Term: 25
Status: On Going
CUF Gebeng
Configuration: 3 x 36 (GT)
Generating Capacity: 108 MW
Generation Type: COGEN
COD: 1999
Contract Type: Cost Plus (OMS)
O&M Term: 5
Status: Completed
Segari Energy Venture Lumut Power Plant (LPP), Malaysia
Configuration: 6 x 141.1 (GT), 2 x 228.2 (ST)
Generating Capacity: 1,303 MW
Generation Type: CCGT
COD: 1996
Contract Type: Lump Sum
O&M Term: 20+10
Status: On Going
GB3 (LPP Block 3), Malaysia
Configuration: 3 x 143 (GT), 1 x 221 (ST)
Generating Capacity: 640 MW
Generation Type: OCGT
COD: 2001, 2002
Contract Type: Lump Sum
O&M Term: 21
Status: On Going
Prai Power Plant, Malaysia
Configuration: 1 x 230 (GT), 1 x 120 (ST)
Generating Capacity: 350 MW
Generation Type: CCGT (Single Shaft)
COD: 2003
Contract Type: Lump Sum
O&M Term: 21
Status: On Going
CUF Kerteh
Configuration: 6 x 36 (GT)
Generating Capacity: 216 MW
Generation Type: COGEN
COD: 1999
Contract Type: Cost Plus (OMS)
O&M Term: 5
Status: Completed
LOCAL O&M PORTFOLIO
Plant Name Configuration Generating Capacity Generation Type COD Contract Type O&M Term Status
CUF Kerteh 6 x 36 (GT) 216 MW COGEN 1999 Cost Plus (OMS) 5 Completed
CUF Gebeng 3 x 36 (GT) 108 MW COGEN 1999 Cost Plus (OMS) 5 Completed
Segari Energy Venture Lumut Power Plant (LPP), Malaysia 6 x 141.1 (GT) 1,303 MW CCGT 1996 Lump Sum 20+10 On Going
2 x 228.2 (ST)
GB3 (LPP Block 3), Malaysia 3 x 143 (GT) 640 MW OCGT 2001 Lump Sum 21 On Going
1 x 221 (ST) CCGT 2002
Prai Power Plant, Malaysia 1 x 230 (GT) 350 MW CCGT (Single Shaft) 2003 Lump Sum 21 On Going
1 x 120 (ST)
Tanjung Bin Power Plant, Malaysia 3 x 700 (ST) 2,100 MW Coal Fired 2006 Lump Sum 25 On Going
Tanjung Bin Energy, Malaysia 1 x 1000 (ST) 1,000 MW Coal Fired 2015 Lump Sum 25 On Going
Total O&M Portfolio 5,717 MW Power