Operated Plant - International

Mouse over on the power plant to view more details.
Souk Tleta, Tlemcen, Algeria
Configuration: 13 x RO Train
Generating Capacity: 200,000 m3/day
Generation Type: IWP
COD: 2011
Contract Type: Lump Sum
O&M Term: 20
Status: Completed
Shuaibah III Water and Electricity Company, Saudi Arabia
Configuration: 3x300 (thermal) MSF
Generating Capacity: 900 MW, 880,000 m3/day
Generation Type: IWPP
COD: 2009
Contract Type: Lump Sum (sub contract)
O&M Term: 20
Status: On Going
Az Zour EPP, Kuwait
Configuration: 5 x 160 (GT)
Generating Capacity: 800 MW
Generation Type: OCGT
COD: 2008
Contract Type: Fixed Fee
O&M Term: 5
Status: Completed
Az Zour South Add On, Kuwait
Configuration: 5 x 160 (GT), 2 x 200 (ST)
Generating Capacity: 1,200 MW
Generation Type: CCGT
COD: 2013
Contract Type: Fixed Fee
O&M Term: 4
Status: On Going
Al-Gubrah Independent Water Project, Oman
Configuration: 11 Train Reverse Osmosis
Generating Capacity: 191,000 m3/day
Generation Type: IWP
COD: 2014
Contract Type: Lump Sum
O&M Term: 20
Status: On Going
Merak Coal Fired Power Plant, Indonesia
Configuration: 2x60 MW
Generating Capacity: 120 MW
Generation Type: Coal Fired
COD: 2013
Contract Type: Fixed Fee
O&M Term: 5
Status: On Going
INTERNATIONAL O&M PORTFOLIO
Plant Name Configuration Generating Capacity Generation Type COD Contract Type O&M Term Status
Az Zour EPP, Kuwait 5 x 160 (GT) 800 MW OCGT 2008 Fixed Fee 5 Completed
Az Zour South Add On, Kuwait 5 x 160 (GT) 1,200 MW CCGT 2013 Fixed Fee 4 On Going
2 x 200 (ST)
Merak Coal Fired Power Plant, Indonesia 2x60 MW 120 MW Coal Fired 2013 Fixed Fee 5 On Going
O&M via Subcontracting
Shuaibah III Water and Electricity Company, Saudi Arabia 3x300 (thermal) MSF 900 MW, 880,000 m3/day IWPP 2009 Lump Sum (sub contract) 20 On Going
Shuaibah III Water Desalination Expansion, Saudi Arabia 10 Train Reverse Osmosis 150,000 m3/day IWPP 2009 Lump Sum (sub contract) 20 On Going
O&M via Partnership
Souk Tleta, Algeria 13 x RO Train 200,000 m3/day IWP 2011 Lump Sum 20 On Going
Al-Gubrah Independent Water Project, Oman 11 Train Reverse Osmosis 191,000 m3/day IWP 2014 Lump Sum 20 On Going
Total O&M Portfolio 3,020 MW Power and 1,421,000m3/day Water